{"id":48733,"date":"2020-04-24T11:43:18","date_gmt":"2020-04-24T09:43:18","guid":{"rendered":"https:\/\/heatwork.com\/?p=48733"},"modified":"2022-01-20T11:32:53","modified_gmt":"2022-01-20T10:32:53","slug":"new-green-hospital","status":"publish","type":"post","link":"https:\/\/heatwork.com\/en\/2020\/04\/new-green-hospital\/","title":{"rendered":"Building a new green hospital"},"content":{"rendered":"<div class=\"o-carousel js-carousel\"><div class=\"o-carousel__main js-carousel-main frdaw\" data-id=\"frdaw\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/heatwork.com\/wp-content\/uploads\/2020\/04\/HeatWork_Ramudden_Haugesund.png\" width=\"480\" height=\"580\" alt=\"\" \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/heatwork.com\/wp-content\/uploads\/2020\/04\/HeatWork_Ramudden_Haugesund3.png\" width=\"576\" height=\"659\" alt=\"\" \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/heatwork.com\/wp-content\/uploads\/2020\/04\/HeatWork_Ramudden_Haugesund2.png\" width=\"486\" height=\"569\" alt=\"\" \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/heatwork.com\/wp-content\/uploads\/2020\/04\/HeatWork_Ramudden-1.png\" width=\"360\" height=\"346\" alt=\"\" \/>\n<\/div><ul class=\"o-carousel__nav js-carousel-nav\"><li><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/heatwork.com\/wp-content\/uploads\/2020\/04\/HeatWork_Ramudden_Haugesund-290x290.png\" width=\"290\" height=\"290\" alt=\"\" \/><\/li>\n<li><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/heatwork.com\/wp-content\/uploads\/2020\/04\/HeatWork_Ramudden_Haugesund3-290x290.png\" width=\"290\" height=\"290\" alt=\"\" \/><\/li>\n<li><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/heatwork.com\/wp-content\/uploads\/2020\/04\/HeatWork_Ramudden_Haugesund2-290x290.png\" width=\"290\" height=\"290\" alt=\"\" \/><\/li>\n<li><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/heatwork.com\/wp-content\/uploads\/2020\/04\/HeatWork_Ramudden-1-290x290.png\" width=\"290\" height=\"290\" alt=\"\" \/><\/li>\n<\/ul><\/div>\n<p><strong>Veidekke is building a new hospital in Haugesund, with green building heat<\/strong><\/p>\n<p>Developer: Helse Fonna HF<br \/>\nTime frame: September 2018 &#8211; July 2021<\/p>\n<p>A turnkey contract in conjunction with the construction of a new hospital in Haugesund. The gross area of the new building, including a technical centre, is estimated to be 20,451 m\u00b2. The work covers the erection of carcasses, connection to existing buildings, erection of a separate technical building, all technical installations and interiors in new building, testing, etc.<\/p>\n<p>The new south-west block is to be built as a passive building and shall satisfy the requirements of \u201cGr\u00f8nt sykehus\u201d [Green hospital]. A key element of this are the building fa\u00e7ades. The fa\u00e7ades have been designed to comply with energy requirements, create good and light spaces, and to deliver a significant level of generality and flexibility.<\/p>\n<p><strong>Ramudden Norge AS:<\/strong><br \/>\n&#8211; At Haugesund Hospital, we have supplied green building heat, which is part of our focus on developing greener facilities areas.<\/p>\n<p>&#8211; Indoor climate, environment, and health and safety are very important to our customers, and we have supplied HeatWork and CliWi fluid-borne heating. It contributes to even temperature and heat distribution, collecting dust and particulates that circulate through the system. The system is powered by biodiesel.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;Indoor climate, environment, and health and safety are very important to our customers, and we have supplied HeatWork and CliWi fluid-borne heating&#8230;&#8221;<\/p>\n","protected":false},"author":11,"featured_media":44171,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[4],"tags":[],"class_list":{"0":"post-48733","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-reference-projects-en"},"acf":[],"_links":{"self":[{"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/posts\/48733"}],"collection":[{"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/comments?post=48733"}],"version-history":[{"count":2,"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/posts\/48733\/revisions"}],"predecessor-version":[{"id":48735,"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/posts\/48733\/revisions\/48735"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/media\/44171"}],"wp:attachment":[{"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/media?parent=48733"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/categories?post=48733"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/heatwork.com\/en\/wp-json\/wp\/v2\/tags?post=48733"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}